next up previous
Next: Rating Curves Up: Method 1: Estimate Previous: Method 1: Estimate

The Worked Record

Traditionally, a graph of sediment concentration versus time, , was drawn by hand [ Porterfield, 1972]. After sample values were plotted on the graph, the line was drawn on the basis of hydrologic judgment, sediment transport curves, and experience. The load estimator, , was then evaluated numerically [ Press et al., 1986, Chapter 4]:

The quality of as an estimator depends on the hydrologist's skill and training.



U.S. National Report to IUGG, 1991-1994
Rev. Geophys. Vol. 33 Suppl., © 1995 American Geophysical Union